Warehouse & distribution

Pick assist is live.
Is the night shift running it right?

Optimizers are confident, fast, and working from counts that went stale at 2am. The question is what your crew does when the screen and the bay disagree.

What you probably deployed

The tools this covers

If it makes a recommendation your people have to accept or reject, it is in scope.

  • Pick-path and slotting optimizers
  • Inventory and cycle-count agents
  • Dock and yard scheduling
  • Voice and vision picking assist

Who gets assessed

Pickers and packersReach and forklift operatorsReceiving and inboundYard hostlersShift leads
Simulation of your toolMeasuring
NorthStar WMS Pick AssistSHIFT 2, 04:12
NEXT PICK, RECOMMENDED
Bay 14, SKU 4471
6 units on hand, route optimized, 41s to location
confidence 0.94

You were in Bay 14 twenty minutes ago. The slot was empty. What do you do?

AGo to Bay 14. The system shows stock.
BMark it short and move to the next pick.
CPull the same SKU from another bay.
DVerify, then report the count discrepancy.

What actually goes wrong

The failure modes that bite in warehouse & distribution

We build scenarios around these, then measure who catches them. Every wrong answer we write is something a real person does on a real shift.

Stale counts, confident routing

The optimizer keeps sending people to a slot it believes is full. Each trip costs a few minutes, and nobody reports it because the system says it is right.

Over-trust after a good run

Ten correct routes in a row and the eleventh stops getting checked. The good streak is what makes the bad one expensive.

Short-picks that never get reported

Marking short and moving on is faster than escalating, so the count stays wrong and the next shift inherits it.

What you get

Readiness by role, site and shift

Scored against your own override policy and escalation path, not a general best practice, so it holds up when somebody disputes it.

  • Where the gap sits by shift, which is usually the real story
  • Coaching to whoever missed something, built from your own rules
  • A 30-day retest that says whether it actually closed
  • Role and shift aggregates only. No individual appears in executive reporting

See the report →

Pickers and packers42 ASSESSED
61Developing
When to override
Escalation
Data handling

ILLUSTRATIVE. SHOWS WHAT THE REPORT CONTAINS, NOT A RESULT WE HAVE ACHIEVED.

Start with one system and three roles

Assessments from $18,000, priced on your headcount band. About six weeks end to end.

Book 15 minutes →