Product

A practical exam on the
machine you actually bought

Three parts. A simulation of your tool, judgment scored against your own written rules, and a report the person who signed for the rollout can take to their boss.

01. The System Brief

We study your system before we build anything

Everything downstream is generated from this. Upload what you already have. An interviewer fills the gaps in about twenty minutes with somebody who knows the tool. Every field shows where it came from, a document or a line of the interview, and you approve the Brief before anything is built from it.

  • What it does, in the worker’s language rather than the vendor’s
  • Which model runs it and what data it touches
  • Where it may act alone, and where it only recommends
  • Your override policy. This becomes the answer key
  • Your escalation path, as a named role rather than “your supervisor”
  • Prohibited inputs. What must never be pasted into it
  • Known failure modes. Where it has been wrong before
That last one matters most. Nobody volunteers it, and without it every scenario about judging the tool’s output is invented. We ask three different ways.
System Brief, draftv2, AWAITING SIGN-OFF
TOOL
NorthStar WMS Pick Assist
ACTS ALONE
Route sequencing only. Never adjusts inventory counts.
OVERRIDE POLICY
Any count mismatch is reported before the next pick. SOP 4.2.
KNOWN FAILURE MODES
Stale counts after a partial cycle count. Confident routing to empty slots.
SOURCES: 3 SOPs, 11 SCREENSHOTS, 1 ROLLOUT DECK, 22 MIN INTERVIEW

02. The scenarios

Eight to twelve situations, per role, per system

Generated from three inputs, and the mix is what makes them real. Your Brief supplies the specifics. Our failure-mode library supplies the judgment situations. The dimensions set what each one has to test.

  • Multiple choice, free text, and the simulated tool itself
  • Written in Spanish from the Brief, not translated out of English, and approved by someone who reads Spanish
  • Weighted per role. A picker who never prompts anything is not scored on prompting
  • Reviewed and signed off by your own expert before a single worker sees one
  • Every worker gets a shuffled draw: a different bay or reading, the same right answer

Five dimensions

Task fit. Knowing when to use it, and when not to.
When to override. Knowing when to trust it, and when not to.
Escalation. Knowing when to stop, and who to call.
Data handling. Knowing what must never go in.
Input quality. Asking it the right thing, where the role involves asking.
Scenario reviewSME SIGN-OFF
SCENARIO 4, WHEN TO OVERRIDE, HIGH RISK

You were in Bay 14 twenty minutes ago. The slot was empty. Pick Assist shows 6 on hand and routes you back. What do you do?

Go to Bay 14. The system shows stock.
Mark it short and move on.
Verify, then report the discrepancy. ← SOP 4.2
Every wrong answer is something people actually do. If the wrong answer is obviously wrong, everyone passes and the score means nothing.

03. Grading

Can you trust a model to grade this?

Fair question, and it comes up in the first meeting. The answer is a screen, not a sentence.

Graded against your rules

Each scenario ships with a rubric written from your own SOP. We never grade against a general best practice. If your override policy is unusual, the rubric is unusual.

Low confidence goes to a person

The grader returns a dimension hit and a confidence. Anything it’s unsure about routes to a review queue before it counts. A person also checks a random 5% blind, and the agreement rate is printed in your report.

Arithmetic never touches a model

The model reads free text and classifies it. Every score, rollup, rate and trend is computed in code. The number on the report is not a guess.

Criterion, not a curve. Readiness is measured against your own override policy and escalation path, not against how other companies did. That is how professional certification works, and it is why the first report means something without a benchmark to compare to.

04. The report

What lands on your desk

Risks first, two minutes to read, and a number the rollout owner can defend in a steering committee. Your operations lead signs it as accurate before it goes anywhere.

  • Readiness by role, site and shift, with the risks written in plain language
  • Internal comparisons, which are usually the actionable part: nights against days, site against site, six-month people against six-year people
  • A 30-day retest showing whether the coaching moved anything
  • Where your rules are silent or your own experts disagree, a finding. Never a change to the number
  • A PDF rendered once and stored, so the file your ops lead signs is the file the committee reads
No individual ever appears. Role and shift aggregates only, and any group under five is suppressed, so a small team can’t be read as the people in it. Individual results go to that worker and their direct manager, for coaching.
Night shift, Pickers42 ASSESSED
61Developing
When to override
Escalation
Data handling
Task fit

Coaching statusLessons sent to everyone in this group who missed something

Export PDF

ILLUSTRATIVE. SHOWS WHAT THE REPORT CONTAINS, NOT A RESULT WE HAVE ACHIEVED.

See it against your own tool

Fifteen minutes. Tell us what you rolled out and we’ll show you what we’d test.

Book 15 minutes →